1969 27' Irwin Sloop
Some More Details
- The mast and rigging were replaced - 1991.
- The teak toerail was removed and redone - 1996.
- The deck and cabin were repainted while the toerail was off - 1996
- All of the deck hardware was rebedded - 1996.
- New head installed - 1998.
- The cabin cushions were re-upholstered - 2000.
- The mast was rewired and a new main electrical panel was installed - 1998.
- A new battery charger was installed - 1997.
- The propeller shaft and bearing were replaced - 1998.
- The bottom was treated with Interlux 2 part epoxy and repainted - 2000.
- Lots of other updates have been made in the past year.