1969 27' Irwin Sloop


Some More Details

  1. The mast and rigging were replaced - 1991.
  2. The teak toerail was removed and redone - 1996.
  3. The deck and cabin were repainted while the toerail was off - 1996
  4. All of the deck hardware was rebedded - 1996.
  5. New head installed - 1998.
  6. The cabin cushions were re-upholstered - 2000.
  7. The mast was rewired and a new main electrical panel was installed - 1998.
  8. A new battery charger was installed - 1997.
  9. The propeller shaft and bearing were replaced - 1998.
  10. The bottom was treated with Interlux 2 part epoxy and repainted - 2000.
  11. Lots of other updates have been made in the past year.

1