Kingdom Hall Site Info and
Building Pictures
Site Pictures Zip
file of all pictures of Sept.12/13 weekend (2.3 meg.)
Article on quick build in Fort McMurray Today
paper
Oct 9-11 This weekend we will complete the Kingdom Hall to the point
to having a useable place of worship. This will include the interior finishing,
heating and air conditioning, the floor covings, the seats etc.
Oct 3-5 This weekend we worked on the landscaping, installed the main
entrance door and painted the chair frames
Photos courtesy of W.Peterson
Sept 21-27 This week we had a contractor finish the fascia and eaves
troughs. On the weekend we completed the final grade of the lot and laid
the sod, planted trees and built a rock garden.
Sept 18-20 1998 This weekend we completed the stucco on the outside,
the insulation was installed in all the walls and the poly was stapled
up on the walls and ceiling.
Sept.11-12-13 1998: This weekend was the construction of the
outside of the hall, including brick work shingles and fascia. Also the
electrical, plumbing, sound, vac lines and other systems were roughed in.
July 27- Aug. 5 We completed the preparations for the Kingdom
Hall build with the completion of the curbing, the Air Conditioner pad
and the paving of the parking lot by Wilson Contracting. We now are waiting
for the quick build weekend, which is going to happen this fall.
July 23 - 26 This week we laid in the rebar and attached
the lines for the in floor heating system. On Saturday at 7:00 AM the concrete
for the pad arrived. We used a concrete pump unit to place the concrete
and by 11:00 AM the concrete was completely troweled and starting to set.
The 4100 sq.ft. of pad took 11-1/2 truck loads of concrete. In the
afternoon the form on the front was removed and the insulation for the
footings was put in place
July 12 - 19 This week we continued the forming of building pad. The
plumbers came and roughed in the drains and water pipes. The electrical
and telephone conduit was also trenched in. After we tamped the gravel
fill for the pad for a firm bed for the concrete.
July 7- 12 This week we had a contractor do the primary site filling
and grading. Also the contractor laid the waterline across Gregoire Drive.
We formed and placed the concrete curbs for the parking lot. We also started
staking out the concrete pad for the building.