Construction Log June 18-23 | ||||||||||||||||||||||
Week of June 18th through June 23rd, 2001 Eeek, has it been a whole month since the last update? Well, things should start progressing more quickly now. The well agreement we were anticipating being wrapped up May 21st was not agreed to by all parties until the first week in June. As a result, our builder did not close on the lot until June 5th. That week, they began clearing trees. Unfortunately, Mother Nature did not cooperate. We got heavy rains every couple of days. This made for slow going for the tree trimmers. They only got to work every 2nd to 3rd day, and when they did venture out on the lot, they spent more time trying to free their equipment from the mud than clearing trees. What was projected to be a three day job took two weeks, including weekends. Once the lot was clear enough, the excavation company began working on our septic system. The drain feild is located on the very back of our lot, a football field away from the tank. Preparing the drainfield and setting the tanks took two days. Then, once the tree trimmers were done, they dug our foundation and removed all the stumps. Amazingly, they did that in one day. Next week, we anticipate them pouring the footings, building the forms for our basement, and then pouring the basement walls. Then, the framing can begin. Due to the delay in getting the agreement signed and the extra time it took to clear the lot, our projected move in date is now October 17th. |
||||||||||||||||||||||
These three photos show the tree trimming crew in action: | ||||||||||||||||||||||
One of the crew climbs a tree to secure a rope to a tree about to be felled. | ||||||||||||||||||||||
A Bobcat was used to move larger sections of log off the site. | ||||||||||||||||||||||
The crew used a large shredder to chip the branches onsite. | ||||||||||||||||||||||
The next five pics show the excavation crews handiwork: | ||||||||||||||||||||||
The trimmers left the stumps in the ground for the excavators to remove. | ||||||||||||||||||||||
The drainfield for our septic system is on the very rear of our lot. | ||||||||||||||||||||||
One evening all we had was a hole where the septic system connects to the basement. The next day, our entire foundation was dug. | ||||||||||||||||||||||
Here we are checking out our freshly dug basement. | ||||||||||||||||||||||
A view of our basement from what will be the garage. | ||||||||||||||||||||||
Back to Construction Log Page |