THE LIST OF THE MOST
REQUIERED CHECKS DURING
THE PROSESS OF BUILDING
9a. With the finish of the preparations of electricity, plumbing, water.
Installing wood and aluminum frame works and windowsills.
9b. Before the beginning of interior plaster works.
10a. Before beginning of exterior plaster works
10b. After the finish of laying and sealing the Jerusalem stone.
11. With the finish of plaster works, Before painting.
12. On completion of placing sewage/water/electric pips under flooring.
13. With the completion of flooring and tiling works.
14. When installing aluminum windows and exterior doors in finished.
15. When paint works are completed.
16. After installing electric, plumbing and installation fixings.
17. When installing of solar, air-condition, intercom, heating, alarm and
any other system ordered, is completed.
18. After the installment of kitchen, bathroom and any other cupboards.
19. “First Handing” – When the contractor notifies that the flat/house is
ready for “First Inspection” of the Supervisor – interior doors are all
installed, the electric, water, solar and sewage system are in working -
condition, outdoor works are done, the property is clean of building -
materials, and the contractor thinks “the job is done”.
During the First Handing, a protocol is written by the Supervisor (Me).
20. “Last Handing”, When the Initiator (Who ever you signed the contract
with) notifies the consumer in writing, that the unit is ready, including
ground and street works. Government and Municipality permits have
been given, the property is clean, all systems are in working condition,
have been checked and given authorization and guarantee by installers
or producers. All rejects from the first protocol are mended. Another
protocol is written by the Supervisor and the key is given to the owner.