Project Status
Click hyperlinks to see photos:
» Heating
- rough-in for second floor complete
- rough-in for first floor started
- domestic hot water heater (side-arm connected to furnace) started
» Air Conditioning
- duct work rough-in completed
- air exchanger installed
- refrigerant lines installed
» Porch ceiling beadboard and trim - completed
» Painting
- all wood surfaces primed
- color selection complete (I think)
- waiting for the weather to start painting this week
» Plumbing
- rough-in for drain and vent system complete
- rough-in for supply side about to start
» Electrical
- garage window cutout and installation complete (needed for meter install)
- garage west wall partially sided (needed for meter install)
- waiting for the weather to do trenching for underground cabling
- house still about 50% wired
» Back-framing
- about 20% complete
» Landscaping
- trees purchased
- waiting for weather to do final grading and excavation for trees