|
|
ARWO PROVINCIAL DESIGN OFFICE,
Warsaw - Poland. ( July 1987 - June 1989 )
Associate Architect, Project
Manager
Responsibilities:
- Design Development
- Construction Supervision
- Project Management
- Competition Team Leader
- Design through Documents
Projects and Accomplishments:
- Residential Complex ( $14MLN. US )
- Primary School in Plock (
$19MLN. US )
- Commercial Plazas ( $9MLN. US )
- Regional Health Facilities Renovation ( $4MLN.
US )
- Design and construction of a kindergarten for
approx. 140 children in Plock ($ 18 MLN US)
- Project and construction of eight apartment
houses (89 apartments each) in Plock ($ 19 MLN US)
- Design and construction of a sport and
recreation hall in Warsaw ($ 34 MLN US)
- Design and construction of 16 commercial units
for a private contractor in Warsaw ($ 7 MLN US)
UTIMA COMPANY INC. Warsaw
- Poland . June1986 June1989
Project Architect, Project Manager
Responsibilities:
- Design Development
- Construction Supervision
- Project Management
Projects and Accomplishments:
- Design and construction of 20 single family homes
in Warsaw
- Project and reconstruction of a department store
in Warsaw ( $12 MLN. US )
- Reconstruction of the National Museum Warehouse
in Warsaw ($7 MLN. US )
- Construction of a Computer Center for the Polish
Airline LOT in Warsaw. ($9MLN. US )
ANDREW BOLTUC and ASSOCIATES, ARCHITECTURAL
CO., Warsaw JULY 1985-JULY 1986
Project Architect
Responsibilities:
- Participation as a designer in varied interdisciplinary
projects.
- Field studies, documentation and data
Coordination.
- Conceptual, Basic and Detailed Proposals as well
as Technical Specifications
Projects and Accomplishments:
- Construction Engineer. 27 single family homes in
Czestochowa.( $3MLN. US)
- 29 single family homes in Warsaw.( $3,5MLN. US )
- 32 "Stolbud" type wooden structures
homes.;( $2.5MLN. US )
MINISTRY OF HEALTH, Project Design Dept., Warsaw
- Poland May 1982-May1985
Intern- Architect. Team Leader, Project
Manager
Responsibilities:
- Code investigation and compliance
- Field studies, documentation and data compliance.
- Conceptual, Basic and Detailed Proposal as well
as Technical specification
- Team leader and all responsibilities related to
the position.
Projects and Accomplishments:
- Architectural Competition: Conception and
technical design of a standard medical center for a region with
25000 population .First Place ( $14MLN US )
- Technical design of a 650-bed hospital and
adjacent buildings in the town of Lomza ( $90MLN. US )
- Expansion and modernization of a specialized
2500-bed hospital in Warsaw ( $ 130MLN. US )
- Expansion of a Home for Developmentally
Handicapped Women 450-bed in Debe Male ( $ 15MLN. US)
- Participating as team member in designing
hospitals in three medium-size towns in Poland
ARCADY PUBLISHER:
- Warsaw .July1985 July1986
- Graphic Editor design of the cover and specific
articles
- for monthly publication ARCHITECTURA
INTERNATIONAL ARCHITECT'S CONVENTION (UIA):
- Winner one of the first 10 prizes (out of 300)
during an 1981
- Work with Prof. Gustaw Peihl, Architect from
Vienna
EDUCATION AND PROFESSIONAL LICENSES:
- WARSAW
POLYTECHNIC / WARSAW-POLAND 1975-1982/ 1982-MASTER'S DEGREE
IN ARCHITECTURE, ENGINEERING, AND ARCHITECTURAL
TECHNOLOGY.
- 1988
PROFESSIONAL LICENSE (POLISH ASSOCIATION OF ARCHITECTS) -
RECOGNIZABLE BY EUROPEAN ASSOCIATIONS OF THE THE ARCHITECTS
TO PRACTICE IN EUROPEAN UNION COUNTRY.
|