This is a homepage design by Samuel Cheuk-Wai Tsang
Waiwai99
Updated by Waiwai99 07/05/2002
#3 New ComNet Research Project Available (in year 2002 section)
#4 Engineering Project Available (in year 2002 section)
Ray's World (My friend's page !!!!)
Electromechanical System Web site 2000
Software Development Web site 2000
Circuit Analysis Web site 2000
Useful Software: VNC, D/L mobile remote contol(update 22/3/02)
* UTS EFS 1999 (updated 1/3/00) EFS Assignment and Execise for 1999 1st sem, (updated 1/03/00)
EFS journal for 1999 1st sem, (updated 08/3/00)
* UTS Physics Modelling 1 1999 (updated 17/3/00)
Physic modeling 1 technical report, (updated 17/3/00)
Electronics 99 LAB REPORT 3 - OpAMP (in PDF format), (updated 8/8/00)
Electronics 99 LAB REPORT 4 - OpAMP (in PDF format), (updated 8/8/00)
Electronics Lecture notes, (updated 17/3/00)
Summing Amplifer solution, page 1, (updated 5/4/00)
Summing Amplifer solution, page 2, (updated 5/4/00)
EMS Lab 1 Report result (jpg format), (updated 10/03/01)
EMS Lab 2 Report result (jpg format), (updated 16/08/00)
Engineering Communication Group Report, (updated 27/3/00)
Group report part 1: introduction and structure, (updated 30/3/00)
Paper 1: Engineering report, (updated 09/4/00)
Software Development Major Project (stage2, all documents) update (27/3/00)
Software Development Major Project (stage3, SRS Documents v1.2) update (18/4/00)
Software Development Major Project (stage3, SRS Document v1.3 full Zip Document) update (05/05/00)
Software Development Major Project (stage4, SdS Document v1 Zip Document) update (22/05/00)
IDS assignment update (14/09/00)
Tech Assess Project Audit report (15/04/02, 3:22pm)
Legal Considerations - should still apply to SmartCards(15/05/02, 3:22pm)
Smart move by Smart Card industry(15/05/02, 3:22pm)
Vic Policy on Smart Cards(15/05/02, 3:22pm)
Smart Cards general Info(15/05/02, 3:22pm)
Electronic Trading Market(15/05/02, 3:22pm)
ComNet Project Webpage v1.0 (15/04/02, 2:22pm)
ComNet Project Webpage v1.8(17/05/02, 10:22pm)
ComNet Project webpage zip format v2.1 ** most update (27/05/02, 2:45pm)
ComNet Project Proposal (16/04/02, 4:45pm)
ComNet ** Project presentation-min v3.1, actually presentaion slides (02/06/02, 4:45pm)
IEEE 802.11B-1999 standard (09/05/02, 4:45pm)
IEEE_with_Bluetooth.txt(09/05/02, 4:45pm)
Sample Development Plan from SE (02/04/02)
Sample Quality Plan from SE (02/04/02)
1st Meeting Diary page 1 (02/04/02)
1st Meeting Diary page 2 (02/04/02)
1st Meeting Diary page 3 (02/04/02)
Proposal structure outline v1.2 (10/04/02)
2st Meeting Black Board photo (11/04/02)
Gantt PDF chartv 2.0 (07/05/02)
Working program v2.0 (07/05/02)
Finalise Proposal v2.0 (07/05/02)
Introduction reference document (24/05/02)
Art2, Changes model (07/05/02)
Art3, Organisation Changes model (07/05/02)
Allocation Tasks for each member
Tasks: |
Responsible Personnel: |
Progress: |
1. Project objective / Goal |
Samuel Tsang |
90% |
2. Project Outline |
Eric Wu |
90% |
3. Team Management Process |
Scott |
0% |
4. Project Milestone |
Samuel Tsang / Chris Leung |
80% |
5. Work Breakdown structure (WBS) |
Chris Leung |
80% |
6. GATT Chart |
Chris Leung |
80% |
7. Resource Management |
Scott |
0% |
8. Meeting Schedule |
Samuel Tsang |
80% |
9. QA Management |
Amra |
80% |
10. Risk Management |
Amra |
80% |
11. Group Log |
Samuel Tsang |
90% |
12. Project interview invitation letter |
TBA |
|
13. Proposal Review |
TBA |
Centre (-0.56, 0.642); dimension (0.12, 0.12); max iteration = 160.
Centre (-0.62056, 0.6112); dimension (0.0013, 0.0013); max iteration = 100.
Centre (-0.811536, 0.20144); dimension (0.0032, 0.0032); max iteration = 160.
Centre (-0.0956, 0.95912); dimension (0.003, 0.003); max iteration = 240.
Centre (-0.164, 1.038); dimension (0.12, 0.12); max iteration = 160.
Constant (-0.3, 0.7); centre (0, 0); dimension (4, 4); max iteration = 60.
Constant (-0.3, 0.7); centre (-0.32, 0.4); dimension (0.6, 0.6); max iteration = 80.
Constant (-0.56, 0.642); centre (0, 0); dimension (1.5, 1.5); max iteration = 80.
Constant (-0.56, 0.642); centre (0, 0); dimension (0.35, 0.35); max iteration = 100.
Constant (-0.71, 0.3); centre (0.49, -0.16); dimension (0.6, 0.6); max iteration = 240.
Constant (-0.811536, 0.20144); centre (0, 0); dimension (3.2, 3.2); max iteration = 80.