Wednesday March 7, 2007
Footing is complete now and already the blockwork is going up for the floor levels. All that steel was used to ensure that every block had in steel. Many other contractors do steel every 3 or 4 blocks. We have in EVERY block.
Not to mention, ALL of our block holes are being filled with concrete.
Notice the truck is STILL there. stupseeeeee