This is the dinette area. It is prepared for carpeting. |
The family room and kitchen had the old particle board surface removed. |
A foam underlayment is in place |
The half bath floor has been stripped and the toilet removed |
The saw and supply truck are set up in the driveway in front of the garage |
A crew of three put the new floor down |
A sealer was used in the tongue and groove joints |
Straps were used to pull the joints tight |
This is it, from the family room looking toward the kitchen |
Reverse view, from kitchen to family room |
Looks pretty good. With 1 ft squares it is easy to measure the room |
The pattern is a tile pattern called "Satillo" |
Next page: New carpets
Previous page: Removal of the kitchen
cabinets
| skylight | demolition | floor | carpet | cabinets | countertop |
Return to Family main page
Return to Steve's Home Page