HOW ABOUT ME 
Last name:        Chen
First name:        Feng
Date of birth:    10/03/1973
Place of birth:   Hunan, P.R.China
Sex:                 Male
Marital status:  Single
Citizenship:      Chinese
Hobbies:         Calligraphy, Basketball, Music, Table Tennis, Reading
EDUCATION & QUALIFICATIONS   .
Education:      1. Master Degree of Engineering
                      2. Major Bachelor Degree of Engineering (HUST, P. R. China)
                       Huazhong University of Science & Technology (HUST), Wuhan, P.R.China

Qualifications: 1. HUST very Excellent Student in Study, 1994 (the highest scholarship for undergraduate)
                      2. Electrical Education Fund Scholarship of China, First Class,1995
                      3. Excellent Student, First Prize, 1997 (the highest scholarship for graduate)
                      4. Science & Technology Invention Prize of Hubei Province, 1995
                      5. Science & Technology Invention Prize of HUST, 1993, 1995
                      6. Power System Science & Technology Progress Prize of Hubei Province, 1994
                      7. etc.

PUBLICATIONS 

  •  “A Line Loss instrument Based on 8031 Microcomputer & FDC for Distribution Networks”, April 1998
  •  “A Digital Clamp-in Meter for Phase and Frequency”, Oct. 1997
  •  “A Small Computer System Composed by 80C196”, Dec. 1997
  •  "Composite Generation and Transmission System Reliability Evaluation Including System Health        Constraints", Oct., 1998
  •  "Well-being Framework for Composite Generation and Transmission System Reliability Evaluation ", Nov., 1998
  • PROFESSIONAL EXPERIENCES 
  •  Course Project: developed a primary system for a power system networks
  •  Line Loss Management System:   which aims at calculating line loss, proposing methods for reducing line loss, and providing data for line loss management. Its hardware is a microprocessor system (gather data from power system and do calculations) and management software, programmed by C (acquires outcome from the hardware through communication or Floppy Disk, analyzes, makes report, and prints it). A FORTRAN program serves as its simulation tool.
  •  Substation Protective Relaying Unit: which consists of transformer protection and power line protection.
  •  Phase and Frequency Measuring Device:   which can measure phase or frequency of electrical signals, It was completely made of Logic Integrated Circuits.
  •  Alarming System:  Designed by PLC and microprocessor, The System can detect and report fault information and signals.
  •  Substation Automation System:   which is aimed at automatic operation of substation, It's made of microprocessor systems,   altogether with Industrial Computer. Serial Communication is dealt with in the networks. The upper management program is compiled with Visual Basic.
  •  Power Stability and Voltage Stability Analyse:   a project of  a local power network in Yueyang, Hunan
  •  Database Design:   constructed a database system for laboratory management.
  •  Power System Reliability Evaluation, mainly in the area of Composite Generation and Transmission System.
  • 1