Our House Under Construction in Asan



Around April 1998.  Looking left over Asan Village towards Asan Park and Camel Rock.  For those of you familiar with Asan, the white building top center is Joe & Flo's.


Around June 1998.  The second floor is going up.



Around June 1998.  Looking out from the second floor.  The hole on the left is the stairwell.  The area with the wheelbarrow in the middle is Tony's room.



Around October 1998.  Windows and interior walls are being installed.



Around June 1999. We moved in March 1999.  We still have alot of work to do, but the main construction is done.  Besides the picture on the main page, this is all I have for now.   I will update as I take more pictures.