New House - May 2000 - Plumbing

Over the winter, Wayne Underwood did quite a bit of the plumbing and in the early spring the water heater arrived. Wayne used Aquapex flexible plastic tubing for the supply lines.

shower valves
Plastic tubing feeds bathroom shower.


shower base
Rick sloped the floor of the shower with shingles and shims, poured thinset over it,
and put a flexible plastic liner over that and up the side walls.
Next came about two inches of concrete, sloped to the drain.

Jump to: the next phase | the new house page | Our Geocities home page | KC Travel Site

1