New House - June 99 - Electrical Service Entrance

Backhoe

The new backhoe was attached to the tractor on 15 June

and used to finish the electrical trench to the garage. ==>

Trench to garage
Picking up stone
Rick picking up no 2 stone to fill ...
Dumping stone
... the area for the transformer pad.
Rock pile
There is a reason it is called Quarry Road.

Backfilling
Drainage pipe is put in the trench along with the telephone lines.
The trench gets partially backfilled, warning tape is inserted,
and then the trench is filled.

Dan Gardi of Hectic Electric
Dan Gardi of Hectic Electric starts to put the conduit in the trench.
He is holding the heat blanket that softens the plastic pipe so that
it can be bent to conform to the twists and turns of the trench.