I have built a wine cellar in every house that I bought. This is the first time I got to start with a clean slate. Slate is indeed the word: I sat on a skid-mounted 500 lb jackhammer for an entire day to dig this down 4 feet deeper. |
For all the skeptics, note that I actually own a level and even use it, on occasion. |
She gets my vote for hod carrier of the year. |
Several cores had rebar inserted into holes drilled in the floor. Concrete was then poured into those cores. At the end of two days, we had three courses up. |
The heat became brutal as the northeast reached 90F almost every day. We generally put up a course in the morning, stopped for lunch and a siesta, and put up a second course late in the afternoon. |
By the end of July, we had 10 courses reaching 6'8". This is the final block being nudged into place. |
On 19 August we poured the floor of the cellar and the roof of the wine cellar using a fiber reinforced concrete. There was so much extra concrete that we poured an apron in front of the garage and filled a couple sonotubes to be used for piers on the deck. This rather dark picture was taken inside the wine cellar as I stripped off the forms. That is not a cane, although I felt as if I needed one. It's a wrecking bar. |