New House - November 99 - Rough Landscaping

South Face
South side
West Face
West side
North Face
North side
East Face
East side
Wayne Underwood got the septic system inspected and moved on to landscaping. He continued to dig in the shale pit that he had used for the driveway, eventually moving over 200 yards of material. Next spring, after this settles, we will bring the topsoil removed from the driveway road bed up to top off the grade. Some stone walls are needed on the west, beside the basement entrance.

Jump to: the next phase | the new house page | Our Geocities home page | KC Travel Site

Last updated 16 Nov 99

1