The wire finally arrived and, with a bit of difficulty, was pulled through the conduit connecting the pole to this fiberglass pad. A transformer gets mounted on the pad and the meter goes on the post. |
One line carries 100 amps to the garage and this trench heads toward the house with a 200 amp line, 6 phone lines, and this plastic coated tubing for propane . |
On 16 July, NYSEG arrived and picked up the 7800/220V pad-mounted transformer that will sit near the house and ... |
... placed it on the pad. |
Meanwhile, two trucks were used to put the stepup transformer on the pole near the existing house. This transformer changes the 4200V three phase on the pole to 7800 single phase and sends it up the trench to the pad. |
They returned on 20 July and set the meter. |
Lights in the workshop/garage. |