Digging Footer With Rented Kubota Tractor

Progress
July 2005
Aug 2005
Nov 2005
Jan 2006
Feb 2006
May 2006
July 2006
Aug 2006
Oct 2006
Demolition
Back Porch
Pecan Tree
Kitchen 1
Kitchen 2
Kitchen 3
Footer/Foundation
Dig Footers
Build Foundation
Filling an Antique Septic Tank
Piers
Framing
Floor Joists
Framing Day 1
Framing Day 2
Framing Day 3
Framing Day 4
New windows
Wiring
Plumbing
Sewer Line
Water Line
Painting
West Wall
East Wall
South Wall-West Gable
Front Door
New East Wall
New West Wall
New North Wall
Last New Wall
Front Porch
Repairs


We rented a Kubota backhoe for the weekend to dig the footer. Since it was raining and at afternoon rush hour, we opted for the delivery of the tractor. The rental yard was about 2 miles distant and the other times we rented the tractor we picked it up and returned it ourselves. Jim drove it at it's top road speed and Elizabeth followed with the big truck and the flashers going.

The driver of the big rig assured us it was not unusual to deliver the little Kubota with his truck.


We elected to dig the trench the proper width and depth with the backhoe so we would not have to frame the footer.


Pouring footer


Adding rebar to tie the concrete block to the footer. We wanted the rebar to pass through the holes in concrete blocks which we would be using for our foundation. We tried to calculate where the holes would be and then place the rebar at this spacing.

The building inspector told us we had to have the footer one foot below undisturbed soil. However, to complicate matters, we had to design it so when three rows of blocks were on top of it, the floors of the addition and original house would be the same height. In the end, we used framing timbers to outline the footer to establish a height to finish the poured concrete.


The building inspector pays a visit and signs off on our footer. This was one of the first visits paid us by the inspector.


Since we had rented the tractor for the weekend and would have some extra time for it, we decided to also fill some low spots in the yard where we noticed water standing following rainstorms and provided mosquito habitat. We ordered our first load of dirt - a load of Georgia topsoil.